Some things to remember about the BSP in Science:
- This was assigned on 1/9/12. It is due on 3/26/12.
- Follow the directions packet you were given on 1/9. Lost yours? See the lefthand sidebar for another copy to print.
- PERIODS 2-6: Be thinking about your VISUAL PIECE. See me with questions during tutorials. Do not wait until a few days before the project is due. Remember you have the 15 questions to answer as well, according to the directions in the BSP packet AND the visual piece. Both are turned in on the due date.
- Period 7: One last GRQ due on 3/5. IF you have any questions regarding the culminating portion of the project, please set aside time to attend tutorials to get questions answered.
- As announced today, as of 3/17, there are four weeks remaining until the due date of the BSP, three if you don't count the week of Spring Break.